The Borealis Project
100% owned and fully equipped for present mine operations and future expansion: access, workforce, power, water and permits.
Project Highlights
Operating Heap-Leach Gold Mine & Processing Facility in Nevada
Mine Highlights
Mining from multiple open pits with active crushing & stacking
LOCATION & PROPERTY
Nevada is #1 on the Fraser Institute’s 2025 Annual Survey of Mining Companies Investment Attractiveness Index
14,600 acre land package, with significant road network and infrastructure on site
Infrastructure: Electricity from NV Energy grid, permitted Water from 375 gpm well field 3 miles from ADR facility
Great Location: Located in the Walker Lane Gold Trend, with endowment of >50 Moz gold
Investment Highlights
No regional exploration on the project since 2008
Numerous undrilled high priority geophysical targets from historical CSAMT, IP, Mag, & EM surveys
Currently completing HyperSpec survey, LiDAR interpretation, and soon to fly property-wide Magnetics
Numerous undrilled high grade grab sample targets
Borealis Technical Report
The technical report dated June 28, 2024, effective as of June 25, 2024, entitled “NI 43-101 Technical Report – Project Status Report, Borealis Mine, Nevada, U.S.A.” was prepared by Douglas Reid, P.Eng., Principal Consultant (Resource Geology) of SRK Consulting (U.S.), Inc. Mr. Reid is a qualified person for purposes of NI 43-101 and is independent of the Company.
Processing & Refining
Processing Facilities on Site

ADR Exterior Columns

Kiln

Refinery

ADR Interior

Preg Pond

Deep Bed Scrubber
About Borealis Mining Company Ltd.
Borealis is a Nevada gold producer focused on mining and exploration at its Borealis Mine, advancing its Sandman development project, and exploring its Big Balds project. The Borealis Mine is a fully permitted, actively producing mine site with operating heap leach pads, an ADR facility, and all the infrastructure needed for heap leach gold production. In addition to the mine, the property is highly prospective for additional high-sulfidation gold mineralization. It comprises 815 unpatented mining claims of approximately 20 acres each, totaling approximately 16,300 acres, and one unpatented mill site claim of about five acres in western Nevada. The Sandman project is a development-stage project with an NI 43-101 compliant resource and a 2026 Preliminary Economic Assessment that indicates compelling economics, particularly at current gold prices. Borealis is led by a strong board and management team, many of whom have founded, managed, and sold highly successful mining and exploration companies.
About The Borealis Project & Mine
The 100%-owned Borealis Mine is a fully permitted mine site equipped with active heap leach pads, an ADR facility, and all necessary infrastructure to support present mining operations and future expansion. It is an underexplored property located in one of Nevada's most productive gold belts, with multiple high-priority exploration targets and significant potential for additional high-sulfidation gold mineralization. Borealis is also advancing its Sandman gold project, an advanced-stage exploration asset with an updated Preliminary Economic Assessment published in 2026.
Contact Information
Borealis Mining Company Ltd.
217 Queen St W #401,
Toronto, ON M5V 0R2
Kelly Malcolm
CEO & Director
kmalcolm@borealismining.com
The scientific and technical information on this website has been reviewed and approved by Kelly Malcolm, P.Geo., President & CEO at Borealis Mining Company, a Qualified Person as defined by NI 43-101.